Input Data

Upload the FOUR year networks (one .zip of the Appendix C 'Roadway Network Files', or the YR26/35/40/50_GIS shapefile parts) AND a project listing — either the LaneInventory workbook (preferred, per-direction detail) or the MTP 'RSA Table Online' / 'FT Table Online' PDFs (improvement projects only).

Download Row Accounting (CSV)
Exemption QA (screen) — 40 CFR 93.126/.127/.128

Every row of the RSA/FT tables is regionally significant by construction (2025 conformity report Sec. 3.2), and the listing carries no exempt classification — so this screen only looks one way: rows whose text matches a 40 CFR exempt category surface for a reviewer. Nothing is dropped.

Download Exemption QA (CSV)
Filters
Maps by Network Year (synced)
Project Summary
QA Findings

Each row is ONE inconsistency for one project, year and lane component — a project appears once per inconsistency.

Actionable findings by project
Download All Summary Data

All findings + per-check sheets in one Excel file.

⬇ Download Complete Summary (Excel)
About this tool

QA of the NCTCOG Mobility 2050 travel demand model against the MTP project listings for the 2025 Transportation Conformity analysis. Checks lane consistency per project, year, component and direction; presence both ways; and direction flips. FT corridors use NCTCOG's own exact-equality convention (every link must carry the listing value); RSA segments tolerate variance within the link range.

The four year networks are independent builds — link IDs are not comparable across years, so all cross-year checks run through the listing.

Maintained by the TTI Environmental Modeling Program under IAC-A Subtask 4.1.